Case Study: Site-Specific MDU Build for Outdoor Power Distribution
๐
Client Brief
A UK-based client required a custom-designed Main Distribution Unit (MDU) to support new infrastructure at an outdoor site. The unit needed to be weatherproof, lockable, compliant with site-specific specifications, and built within a tight timeframe. This was the first of two MDUs required for the full project rollout.
๐ง
Our Solution
NKD Group designed, built, and delivered a fully bespoke 630A Freestanding MDU Pillar that was tailored to the clientโs needs and environmental conditions.
Technical Specifications:
- Rating: 630A
- Design: Freestanding, bolt-down pillar
- Outdoor Rating: Weatherproof with lockable doors
- Incoming Supply: 4-pole isolator
- Outgoing Feeders:
- 8 x 4-pole 125A NSX breakers
- Each equipped with Micrologic 5.2 trip units for advanced protection and monitoring
- Cable Entry: Bottom entry with gland plate (minimum 300mm from base)
- Finish: Custom-painted in Green 14-C-39 to match site aesthetic and planning conditions
๐ ๏ธ
Engineering Challenges & Solutions
- Custom Paint Requirement: We matched the clientโs specification using the British Standard BS4800 colour code, ensuring compliance with local visual planning requirements.
- Outdoor Environment: Built to withstand harsh weather, the MDU included IP-rated construction and corrosion-resistant materials.
- Rapid Turnaround: Leveraging in-house stock and design capability, we manufactured and delivered the unit on schedule without compromising build quality.
โ
Project Outcome
The MDU was successfully delivered and installed with zero on-site modifications required โ a testament to our precise design process and client collaboration. The unit is now in service and supports mission-critical electrical infrastructure with high levels of protection, monitoring, and reliability.
This is the first of two MDUs for this site, with the second unit already in progress.
๐ฌ
Client Feedback
โThe NKD team delivered exactly what we needed โ a bespoke, durable and compliant MDU with excellent attention to detail. Their speed and professionalism made the process smooth from start to finish.โ
๐
Looking Ahead
As power demands grow across the UK, NKD Group continues to innovate with fast-turnaround, high-specification LV solutions. Whether your requirement is a single outdoor pillar or a full switchgear suite, we have the in-house expertise to design, build, and deliver.
๐
Need a similar solution?
Contact us to discuss your next project or request a site-specific quotation:
Nick@nkd-group.co.uk
๐ www.nkd-group.co.uk
๐ 01226 496006