Case Study: Site-Specific MDU Build for Outdoor Power Distribution
π
Client Brief
A UK-based client required a custom-designed Main Distribution Unit (MDU) to support new infrastructure at an outdoor site. The unit needed to be weatherproof, lockable, compliant with site-specific specifications, and built within a tight timeframe. This was the first of two MDUs required for the full project rollout.
π§
Our Solution
NKD Group designed, built, and delivered a fully bespoke 630A Freestanding MDU Pillar that was tailored to the clientβs needs and environmental conditions.
Technical Specifications:
- Rating: 630A
- Design: Freestanding, bolt-down pillar
- Outdoor Rating: Weatherproof with lockable doors
- Incoming Supply: 4-pole isolator
- Outgoing Feeders:
- 8 x 4-pole 125A NSX breakers
- Each equipped with Micrologic 5.2 trip units for advanced protection and monitoring
- Cable Entry: Bottom entry with gland plate (minimum 300mm from base)
- Finish: Custom-painted in Green 14-C-39 to match site aesthetic and planning conditions
π οΈ
Engineering Challenges & Solutions
- Custom Paint Requirement: We matched the clientβs specification using the British Standard BS4800 colour code, ensuring compliance with local visual planning requirements.
- Outdoor Environment: Built to withstand harsh weather, the MDU included IP-rated construction and corrosion-resistant materials.
- Rapid Turnaround: Leveraging in-house stock and design capability, we manufactured and delivered the unit on schedule without compromising build quality.
β
Project Outcome
The MDU was successfully delivered and installed with zero on-site modifications required β a testament to our precise design process and client collaboration. The unit is now in service and supports mission-critical electrical infrastructure with high levels of protection, monitoring, and reliability.
This is the first of two MDUs for this site, with the second unit already in progress.
π¬
Client Feedback
βThe NKD team delivered exactly what we needed β a bespoke, durable and compliant MDU with excellent attention to detail. Their speed and professionalism made the process smooth from start to finish.β
π
Looking Ahead
As power demands grow across the UK, NKD Group continues to innovate with fast-turnaround, high-specification LV solutions. Whether your requirement is a single outdoor pillar or a full switchgear suite, we have the in-house expertise to design, build, and deliver.